Planning, Decomposition & Task Graphs

Turning a goal into executable structure — plan-then-act versus interleaved, todo state as a first-class artefact, and replanning when the world disagrees.

28 min read · Part II - Orchestration & State · Updated 9 November 2026

“Migrate the reporting pipeline off the deprecated warehouse connector before the end of the quarter.” This goal has an unknown number of steps, unknown dependencies, at least three human decisions, and no explicit completion criterion.

Asking the model for a numbered list and executing it blindly fails when later observations invalidate earlier assumptions.

6.1Why planning is not a prompt#

Ask a capable model to plan the migration above and you will get a plausible seven-step list. Execute it blindly and you will discover, at step four, that the connector has a second caller nobody mentioned; that step two’s output does not have the shape step five assumed; and that step six requires a permission the agent does not hold. The plan was not wrong when it was written. It was written before any of the information that determines the plan had been gathered.

This is the structural argument against plan-then-execute, and it has been the empirical finding too. The research literature on LLM planning has been consistently sobering: on classical planning benchmarks, models produce plans that read well and validate poorly, and — importantly — asking a model to critique and repair its own plan does not reliably fix it.12 The broader result generalises beyond planning: models are unreliable at self-correcting reasoning errors without external feedback, and self-correction loops that lack a ground-truth signal can make outputs worse rather than better.3

11The distinction that matters is where the feedback comes from. Self-critique — the model judging its own output — is weak. Verification against the world — running the test, reading the file, querying the table — is strong. The same loop shape with the same model performs completely differently depending on which one it closes over.

The conclusion is not “do not plan.” It is that a plan’s value is as a structure for gathering information, not as a script for executing it. Which reframes the design question from “how do I get a good plan” to “how do I keep a plan honest as evidence arrives.”

Design Rule

Plan to decide what to look at next, not to decide everything up front. The best plan an agent can write at step zero is the one that maximises what it will know at step one — and any planning architecture that cannot revise itself on evidence is a script wearing a plan’s clothing.

6.2Four planning postures#

Four planning architectures offer different tradeoffs:

1 · IMPLICIT — the plan lives only in the model's head goal act act act Cheapest. For short tasks; evaluate. No progress signal, nothing to interrupt or resume against. 2 · PLAN-THEN-ACT — commit before observing plan 1..7 1 2 3 ✗ Every step inherits step zero's ignorance. Good for auditable, genuinely known procedures. Rare. 3 · INTERLEAVED WITH AN EXPLICIT PLAN — the default plan artefact in state, revisable visible to humans act observe act observe act observe EVIDENCE REVISES THE PLAN Progress is inspectable; the plan is state, not prose. Adds context and revision cost; measure the benefit. 4 · HIERARCHICAL — decompose, delegate, verify parent plan verifies results child context child context Buys clean context per subtask (Ch 9), costs coordination and token multiplication (Ch 28). Use when subtasks are independent and their results are cheaply verifiable.
Figure 6.1 - Four planning postures. Posture 3 is a useful default for substantial, uncertain tasks, and the dashed arrow - evidence revising the plan - is the entire difference between it and posture 2.

Implicit planning keeps no plan artefact; the model reasons about what to do next inside its own turn. This is the correct posture for short tasks, and it is what the bare loop in Chapter 4 does. It avoids explicit plan-maintenance cost, while still consuming reasoning and execution resources. An event log can provide progress, interruption and resumption without a separate plan artifact.

Plan-then-act produces a full plan and executes it. Its narrow legitimate use is a procedure that is genuinely known in advance and must be auditable before execution — a compliance-controlled deployment, a documented remediation runbook. If you can write the plan as code, write it as code (Chapter 7). If the plan genuinely depends on what you find, this posture is wrong.

Interleaved with an explicit plan artefact is the default and the recommendation. The agent maintains a plan in state, works the next open item, and revises the plan when observations contradict it. The critical word is artefact: the plan lives in the harness’s state, not only in the model’s context, which is what makes it inspectable, resumable, and interruptible.

Hierarchical decomposition breaks the goal into subtasks and delegates each to a sub-agent with its own context. It buys context isolation, which is genuinely valuable (Chapter 9), and costs coordination overhead and token multiplication (Chapter 28). The precondition people skip: subtask results must be cheaply verifiable by the parent, or delegation just moves the uncertainty somewhere you can no longer see it.

6.3What current long-running harnesses add#

Anthropic’s November 2025 report uses an initializer, explicit feature requirements, incremental implementation and progress artifacts between sessions. Its March 2026 follow-up separates planner, generator and evaluator, with a testable agreement for each work increment. These are workload-specific engineering reports, not proof that three agents are always better. Their useful common principle is to carry requirements and evidence across sessions and verify behavior in the running application. 2025 harness report, March 2026 follow-up, checked 8 September 2026.

A durable plan must also accept authorized user changes without losing history. Keep the original request and each subsequent amendment as versioned inputs; the agent may refine implementation steps but must not silently narrow acceptance criteria. On resumption, recheck the current artifact or external job before trusting a progress note.

6.4The plan as a first-class artefact#

Store the plan as structured state rather than only prose in the context window.

python
class StepState(str, Enum):
    PENDING   = "pending"
    ACTIVE    = "active"
    BLOCKED   = "blocked"      # waiting on a human, or on another step
    DONE      = "done"
    ABANDONED = "abandoned"    # deliberately dropped; keeps the reason


@dataclass
class Step:
    id: str
    description: str
    state: StepState = StepState.PENDING
    depends_on: tuple[str, ...] = ()
    # How we will know this step actually worked. A step without one is a
    # step whose completion is the model's opinion.
    verification: str = ""
    evidence: str = ""             # filled in when verification passes
    note: str = ""                 # why blocked, why abandoned


@dataclass
class Plan:
    goal: str
    steps: list[Step] = field(default_factory=list)
    revisions: int = 0

    def ready(self) -> list[Step]:
        """Steps whose dependencies are all satisfied — the frontier."""
        done = {s.id for s in self.steps if s.state is StepState.DONE}
        return [s for s in self.steps
                if s.state is StepState.PENDING
                and all(d in done for d in s.depends_on)]

This is a design sketch; the reference harness does not implement this graph scheduler. Before accepting a plan, validate unique step IDs, existing dependencies, acyclicity and legal state transitions. A missing dependency or a cycle otherwise looks like an empty frontier forever.

BLOCKED is a distinct state from PENDING. A step waiting on a human approval is not merely un-started; it is un-startable, and the difference determines whether the agent should keep working other branches or stop. Collapsing them produces agents that either spin uselessly or halt when they could have made progress elsewhere.

ABANDONED keeps its reason. Steps get dropped legitimately — the migration turns out not to need a backfill. Deleting them loses the fact that the question was considered and answered, which is exactly what a reviewer will ask about.

verification is a required field in spirit if not in the type. A step that says “update the connector config” with no verification criterion completes when the model decides it has completed. A step that says “…verified by: pytest tests/reporting/ -k connector exits zero” completes when the world agrees. The second is worth roughly ten of the first, and Chapter 24’s trajectory evaluations depend on it existing.

Dependencies make it a graph, not a list. A list forces a total order that the work does not have, which serialises steps that could run concurrently and — worse — hides the real constraint structure. ready() returning a frontier rather than a next-step is what makes parallel execution and sensible replanning possible.

22There is a strong argument that the plan should be a file on disk that the agent reads and writes with ordinary tools, rather than a structure the harness manages. It makes the plan reviewable by humans in their normal tooling and survives anything. The harness can still enforce invariants through validated write tools, schema checks and diffs. Unrestricted file editing alone does not provide those controls. Both designs ship in real products.

Why the artefact pays for itself#

Re-serialising a dozen-step plan costs a few hundred tokens per turn, which accumulates over long runs. Structured plans provide:

A progress signal. “Step 4 of 9, verifying” is information a user can act on. A spinner is not. This alone justifies the cost for any run longer than a minute (Chapter 4).

An interruption point. A human who can see the plan can redirect before the wrong step runs. Chapter 19 makes this the foundation of approval design: the cheapest approval is the one on a plan, not on twelve individual actions.

A resumption anchor. After a crash, “which steps are DONE with evidence” is a far better starting point than replaying two hundred turns of transcript and hoping the model re-derives its position.

A grip on drift. The most insidious long-run failure is not error but drift: the agent ends up doing something adjacent to what was asked. An explicit goal and an explicit step list, re-read every turn, is the cheapest available anchor against it.

GOAL (verbatim, immutable, never compacted): migrate the reporting pipeline off the deprecated connector 1 find callers DONE · grep, 3 found 2 read schema DONE · evidence 3 read runbook DONE 4 patch reports ACTIVE · verify: tests 5 patch ETL READY · in frontier 6 patch dash-api READY · in frontier 7 deploy BLOCKED · 2 approvers 8 verify prod PENDING 9 backfill history ABANDONED · connector kept read path; reason retained WHY THIS IS A GRAPH AND NOT A LIST Steps 5 and 6 are in the READY frontier while 4 is ACTIVE. A list would serialize independent work and lose available concurrency. Step 7 is BLOCKED, not PENDING. The distinction decides whether the agent works other branches or stops — and it is the approval seam (Ch 19). Step 9 keeps its reason. A reviewer will ask why there is no backfill; deleting the step loses the fact that the question was answered.
Figure 6.2 - A plan as state rather than prose. The five step states each change what the agent does next, which is why they are an enum and not a comment.

6.5Decomposition that survives contact#

Four rules govern decomposition:

Each step must be independently verifiable. This is the dominant rule. “Refactor the connector layer” is not a step; “extract the retry logic into retry.py and confirm the existing tests still pass” is. The test is whether you can state, before starting, what observation would prove the step done.

Steps should be sized to a handful of turns. A step that takes fifty turns is a task in disguise and should be decomposed further. A one-turn step can still be valuable when it is a critical check. A handful of turns is a starting heuristic, not a universal productive band, and the reason is failure isolation: when a step fails, you want to retry the step, not the plan.

Dependencies must be real. Agents over-serialise, declaring dependencies that do not exist because sequential prose reads naturally. Every false dependency is lost parallelism and an unnecessary blocking point. The question to ask of each edge: does step B genuinely require an output of step A, or does it merely come after it in the narrative?

Information-gathering steps come first and are cheap. The first two or three steps of almost any good plan are reads: find the callers, check the schema, read the runbook. They are cheap, they are safe, and they are what makes steps four onward correct. An agent that starts by mutating something has skipped the part where it learned what to mutate.

Plan, then verify the plan against reality — before executing it

A distinct step that costs one turn and saves many. After the model produces a plan and before anything executes, run only the read-only steps and re-examine the plan against what they returned.

  1. Model drafts the plan from the goal and whatever context is available.
  2. Harness executes only authorized information-gathering steps whose exposure and cost are acceptable.
  3. Model revises the plan given the actual findings. This is where the “there is a second caller” discovery happens, before committing to a mutation, at the measured cost of discovery.
  4. Now surface the plan for human approval, if the work warrants it — approving a plan grounded in evidence is a meaningfully different act from approving a guess.
  5. Execute, revising as further evidence arrives.

The pattern works because it puts the cheap, safe, high-information actions before the commitment point. Measure whether the discovery pass reduces downstream mistakes enough to justify its cost.

6.6A worked migration graph#

The difference between a list and a graph becomes concrete when you price the trajectory. Take the reporting migration and give each step an illustrative duration in execution slots — one slot is the time Reference Agent needs to complete a bounded unit of work and record its evidence. The number is not a promise about elapsed minutes. It is a common unit that lets you compare two schedules without pretending you know how fast a model call, test suite and approval will be in production.

The initial evidence-grounded plan has nine steps:

ID Step Depends on Illustrative slots Verification
F Find every connector caller — 2 repository and scheduler searches saved
S Read source and target schemas F 2 compatibility diff attached
R Read the migration runbook — 1 required gates extracted
P Patch reporting service F, S, R 6 reporting tests pass
E Patch nightly ETL F, S, R 8 ETL fixture matches target schema
D Patch dashboard API F, S, R 5 contract tests pass
A Obtain deployment approval P, E, D 1 approval event recorded
Y Deploy the migration A 2 rollout reports healthy
V Verify production Y 3 old connector reads are zero

A list spends 30 slots because it imposes a total order. The arithmetic is direct:

2 + 2 + 1 + 6 + 8 + 5 + 1 + 2 + 3 = 30.

That schedule makes the runbook wait for the caller search, even though neither produces an input for the other. It then makes the ETL patch wait for the reporting patch, and the dashboard patch wait for both. The prose order has become a resource constraint by accident.

The graph exposes a critical path of 18 slots. F and R can start together, so the first stage costs max(2, 1) = 2. S then costs 2. The three patches can start after F, S and R are complete, so their stage costs max(6, 8, 5) = 8. Approval, deployment and verification remain serial and cost 1 + 2 + 3 = 6. The critical path is therefore:

max(F, R) + S + max(P, E, D) + A + Y + V

= 2 + 2 + 8 + 1 + 2 + 3 = 18.

That does not mean the graph makes the work 40% cheaper. The same 30 units of domain work still happen. It means an executor with capacity for three independent branches can shorten the ideal wall-clock schedule from 30 slots to 18 — a reduction of (30 - 18) ÷ 30 = 40% — before coordination overhead.

Coordination is real work, so put it into the comparison. Suppose Reference Agent spends one additional slot materialising the graph, one dispatching branch inputs, one reconciling branch results and one checking that the merged evidence satisfies the deployment gate. The graph now consumes 34 active slots of work and 22 wall-clock slots: 30 + 4 = 34 units of work, and 18 + 4 = 22 along the schedule. Relative to the serial list, active work rises by 4 ÷ 30 = 13.3%, while wall-clock time falls by 8 ÷ 30 = 26.7%. The adjusted speed-up is 30 ÷ 22 = 1.36×.

SERIAL LIST — 30 WALL-CLOCK SLOTS, 30 ACTIVE-WORK SLOTS F 2 S 2 R 1 P 6 E 8 D 5 A 1 Y 2 V 3 2+2+1+6+8+5+1+2+3 = 30 TASK GRAPH — LOGICAL STAGES EXPOSE AN 18-SLOT CRITICAL PATH F 2R 1 parallel S 2after F PATCH FRONTIERP 6 · E 8 · D 5max = 8 slots A 1approval Y 2deploy V 3verify max(2,1) + 2 + max(6,8,5) + 1 + 2 + 3 = 18 HONEST COMPARISON — ADD THE COORDINATION TAX Serial list30 work · 30 wall-clockbaseline Graph + coordination34 work · 18 + 4 = 22 wall-clockplan · dispatch · merge · check Result30 ÷ 22 = 1.36× faster4 ÷ 30 = 13.3% more active work
Figure 6.3 - Illustrative task-graph arithmetic for the reporting migration. The graph reduces the schedule from 30 to 18 slots, but four slots of coordination make the honest comparison 30 serial slots against 22 graph slots — 1.36× faster with 13.3% more active work.

This is the economic test for decomposition. Parallelism is valuable only when the critical-path reduction exceeds the coordination tax. If dispatch, context packing, result review and conflict resolution cost twelve slots instead of four, the adjusted graph takes 18 + 12 = 30 slots and produces no wall-clock gain. If the three patch branches touch the same configuration file and repeatedly conflict, their independence was fictional; model them as one step or introduce a real merge boundary.

You can calculate the useful concurrency before you spawn anything. At the patch frontier, total branch work is 6 + 8 + 5 = 19 slots and the longest branch is 8. With unlimited capacity, that frontier cannot finish in fewer than 8 slots. Its maximum useful average concurrency is therefore 19 ÷ 8 = 2.375. Giving the executor ten workers cannot improve the frontier beyond the three available branches, and even three workers sit partly idle because the branch lengths differ. The graph tells the scheduler both what may run and when more capacity has stopped helping.

There is a second bound: the critical path itself. The ETL branch contributes 8 of the graph’s 18 slots, so optimising the five-slot dashboard branch by 40% saves two slots only if it still finishes after the ETL branch. It does not — 3 is still below 8 — so the overall schedule does not move. Cutting the ETL branch from 8 to 6 reduces the graph to 16 slots because that branch is on the critical path. Optimising work off the critical path may reduce spend or free capacity, but it does not reduce completion time.

Measure step durations from traces (Chapter 23). Replace coarse estimates with medians and high percentiles by step class, then compare the predicted critical path with the observed one.

Do not confuse runnable with safe to run concurrently. ready() proves only that declared dependencies are satisfied. It says nothing about two steps writing the same file, consuming the same quota, locking the same tenant record or requiring the same human. Add resource keys alongside dependency edges — for example repo:reporting, warehouse:staging and approver:data-platform — and let the scheduler admit only a conflict-free subset of the frontier. The task graph answers logical precedence; the scheduler still owns operational exclusion.

The worked plan therefore produces three numbers, not one: 34 active work slots, 22 adjusted wall-clock slots and an 18-slot ideal critical path. Cost, latency and theoretical headroom are different quantities. Reporting only the 18 makes the architecture look better than it is. Reporting only the 34 makes useful parallelism look wasteful. Keep all three.

If a tenant lock permits only one mutating branch at a time, the graph still earns a place but the speed-up disappears. P, E and D remain logically independent while the scheduler serialises their 19 slots on the shared resource key. The ideal schedule becomes 2 + 2 + 19 + 1 + 2 + 3 = 29 slots; four coordination slots make it 33, slower than the 30-slot list. The graph still preserves verification, resumption and honest dependencies; it simply does not justify delegation. This counterexample separates two claims people routinely merge: task graphs improve control structure, while parallel execution improves latency only when the environment supplies real concurrency.

6.7Replanning: the part that decides whether it works#

When should the plan be revised? Four triggers are worth encoding explicitly, because “the model will notice” is not a mechanism:

Trigger Signal Response
Verification failed A step’s verification criterion did not pass Retry the step, then decompose it, then revise the plan
Contradicted assumption An observation conflicts with what a later step assumes Revise the plan; the later step may be void
New work discovered Something found that no step covers Insert steps; check whether the goal is still achievable in budget
Blocked with no path No step is ready and none is actively progressing Check live external jobs, missing dependencies and cycles; wait, repair or escalate according to evidence

How much should be revised? Prefer the smallest coherent revision. A model asked “the plan is failing, write a new plan” will write a different plan, discarding correct work and re-deriving conclusions it already had. A model asked “step 4 failed with this error; propose a minimal amendment to steps 4 through 7” produces something reviewable. The narrower prompt is not just cheaper; it is more accurate.

How often is too often? Replanning has a pathology: a plan revised every turn is not a plan, and an agent that thrashes its plan is one that will consume its budget on planning. Count revisions in state, and treat a high revision rate as a signal to stop rather than a state to continue in. Repeated full replans without new evidence are a stall signal. Three is an illustrative alert threshold, not proof of infeasibility. Continue useful independent work, distinguish a live external wait from a blocker, and escalate only when evidence shows that the current path cannot proceed.

Failure Mode

The dangerous replanning failure is goal erosion. Each revision is locally reasonable, and after six of them the agent is working on something the requester would not recognise. The defence is mechanical: keep the original goal verbatim and immutable in the plan artefact, never in a summarisable part of the context, and re-read it on every revision. Compaction (Chapter 9) must be forbidden from touching it.

6.8The migration that became less complete#

In this illustrative scenario, at 16:20 Reference Agent reports that the migration is 83% complete. Five of six original steps are DONE: inventory the callers, patch two services, run the shared tests and deploy. Only production verification remains. The progress display is arithmetically correct — 5 ÷ 6 = 83.3% — and operationally misleading.

Production verification queries the deprecated connector and finds a read every hour. The first assumption is propagation delay: the deployment must not have reached every worker. Reference Agent checks the rollout, sees the new version on every service instance, waits for another read, and sees it again. The scheduler’s request carries a client identifier that does not belong to either patched service.

The actual mechanism is an omitted node, not a failed node. A monthly export job lives in scheduler configuration outside the two application directories searched by the inventory step. Its next-run timestamp was changed to hourly for a quarter-end rehearsal, so a supposedly dormant caller is now active. The initial inventory verification — “repository search returns two callers” — proved only what the repository contained. It did not prove the statement the plan depended on: “these are all production callers.”

This distinction changes the repair. Retrying the deploy cannot help because the deployed artefacts were correct. Re-running the same repository search cannot help because its search space excludes the scheduler. Rewriting the whole plan would discard five pieces of valid evidence. The smallest coherent amendment adds three nodes: inventory external scheduler definitions, patch the export job, and redeploy the expanded patch set. The existing connector-zero verification node reopens as PENDING after the new deployment. The original inventory step remains DONE with its narrow evidence; the new inventory node records that the evidence was insufficient for the broader claim. History stays honest.

The denominator now changes from six steps to nine. Five completed steps out of nine is 55.6%, so the visible progress falls from 83.3% to 55.6% even though no completed work vanished. A user may read that fall as regression. It is actually the plan becoming more truthful. A progress interface that forbids backwards movement pressures the planner to hide discovered work, bundle it into an existing step, or mark the goal complete early. All three choices protect the percentage at the expense of the result.

Progress is not DONE ÷ total unless the denominator is stable. For an evidence-driven plan it rarely is. Show the revision explicitly: “5 of 6 original steps complete; 3 steps added after production evidence; 5 of 9 current steps complete.” Better still, separate accomplished work from remaining forecast. The event log can state that five steps reached verified completion. The current graph can state that four remain. Neither number needs to erase the other.

The fix has two layers. First, strengthen the local inventory criterion: search source repositories, deployment manifests, scheduler definitions and the connector’s own recent client identifiers. Second, add a plan-level invariant that no individual patch can satisfy: production reads through the deprecated connector must remain zero for the defined observation window. Step checks prove that local work happened. Goal checks prove that the composition produced the requested outcome. Chapter 24’s distinction between trajectory and outcome evaluation is the same distinction at evaluation scale.

The incident also exposes why a completion percentage should not drive scheduling. An 83%-complete plan with one high-uncertainty verification step may be farther from completion than a 40%-complete plan whose remaining critical path is measured and unblocked. Schedule from the frontier, resource constraints and predicted critical path. Display percentages only as a summary of recorded state, with revision context attached.

The general lesson is precise: a plan fails when one of its dependencies is false, even if every listed step succeeds. Verification must test both the node and the edge. Did the patch pass its tests? Did the evidence produced by inventory actually justify treating the patch set as complete? Node-level evidence without edge-level assumptions gives you a graph that is internally tidy and externally wrong.

When you revise, preserve four facts in the event stream: the observation that contradicted the plan, the assumption it invalidated, the nodes added or superseded, and the effect on the predicted critical path. That record lets an evaluator distinguish discovery from thrashing. “Plan revised” is not enough; the same event label can describe disciplined evidence uptake or a model changing its mind for no reason.

6.9Measure planning as a control system#

A planner is not successful because it emits plausible steps. It is successful when those steps keep execution pointed at the original goal while the world supplies contradictory evidence. Measure that control loop at three seams: whether steps are verifiable, whether the graph predicts execution, and whether revisions improve the plan rather than merely changing it.

Start with a small instrumentation contract. Every plan revision needs an immutable plan version, a reason code, the triggering observation and a diff of nodes and edges. Every step transition needs the step id, previous and next state, evidence reference and verification result. Every scheduling decision needs the ready frontier, the admitted subset, resource exclusions and the predicted remaining critical path. Without those records, you can count model calls but cannot tell whether planning helped.

Measure Exact calculation Bad value means First response
Evidence coverage DONE transitions with a durable evidence reference ÷ all DONE transitions Below 100% means completion can still be the model’s opinion reject evidence-free transitions
Structural repair rate runs with at least one node or edge amendment ÷ runs with an explicit plan A shift means task mix changed or initial discovery weakened; direction alone is not quality segment by trigger and task class
Invalidation ratio completed nodes later superseded because their evidence was insufficient ÷ completed nodes A rise means verification criteria prove too little strengthen the failing criteria and assumptions
Planning tax model turns used to draft, inspect or revise the plan ÷ all model turns A rise without shorter or more successful runs means planning is consuming the gain shrink the artefact or planning cadence
Critical-path stretch observed graph completion time ÷ predicted critical-path time at approval Above 1 means estimates, waits or hidden resource conflicts were missed break down queue, approval and execution time
Ready-but-idle rate time with a non-empty ready frontier and no active work ÷ time with a non-empty ready frontier A rise means scheduler stalls, capacity starvation or false resource conflicts inspect admission decisions
Goal-drift rate revisions that alter the immutable goal or remove a required completion invariant ÷ revisions Anything above 0% is a control failure block the revision mechanically

Some rows are invariants; others are diagnostics. Evidence coverage and goal-drift rate have clear targets of 100% and 0% because they describe properties the harness controls. Structural repair rate has no universal target. A planner that repairs 40% of research plans may be learning exactly as intended, while one that repairs 40% of a fixed payroll runbook is failing to encode a stable procedure. Segment before you judge.

Work through an illustrative weekly slice. Reference Agent completes 20 planned migrations. Across them, 184 steps transition to DONE; 181 transitions carry durable evidence. Evidence coverage is 181 ÷ 184 = 98.4%. That sounds high and fails the invariant: three completions cannot be audited or safely resumed. Seven runs amend at least one node or edge, so structural repair rate is 7 ÷ 20 = 35%. Eleven completed nodes are later superseded because their evidence was too narrow, giving an invalidation ratio of 11 ÷ 184 = 6.0%.

The same runs consume 410 model turns, of which 62 draft, inspect or revise plans. Planning tax is 62 ÷ 410 = 15.1%. Their predicted critical paths sum to 520 minutes at approval; observed completion spans sum to 690 minutes. Critical-path stretch is 690 ÷ 520 = 1.33. Finally, the scheduler records 160 minutes during which at least one node was ready, and 48 of those minutes had no active work. Ready-but-idle rate is 48 ÷ 160 = 30%.

These numbers tell a coherent story. Three missing evidence references are a correctness defect and should be fixed first. The 6.0% invalidation ratio points to criteria that are locally passing but too narrow, as in the scheduler omission. A 1.33 path stretch alongside 30% ready-but-idle time suggests the delay is not only poor duration estimates; the scheduler is also leaving runnable work untouched. The 15.1% planning tax becomes worth investigating only after you compare outcome success and wall-clock reduction with a simpler posture. Cost without benefit is waste; cost that buys safer, shorter runs is the product doing work.

Do not optimise the repair rate downward. If you reward fewer revisions, the easiest strategy is to ignore contradictory evidence. Pair structural repair with trigger quality: sample revisions and classify whether each cites a concrete observation, changes the smallest coherent subgraph and preserves completed evidence. A high repair rate with strong triggers describes an uncertain environment. A high rate without triggers describes thrashing. A low rate with frequent verification failures describes denial.

Measure predictions at the time they could influence a decision. Recomputing the critical path after completion and comparing it with the same observed durations produces perfect estimates and no learning. Store the prediction when the plan is approved, then store a new prediction at each revision. You can now ask whether amendments reduce forecast error, whether particular step classes are systematically underestimated, and whether approval or resource waits dominate the stretch.

Treat plan quality as a trajectory property, not a single score. Two plans can reach the same result with different risk: one discovers the hidden caller before mutation, the other discovers it in production; one records the reason for an abandoned backfill, the other deletes the step; one escalates an empty frontier, the other loops. Outcome success cannot distinguish them. The plan events can.

The operational response should follow the symptom rather than a blended “planner quality” number:

Symptom Likely mechanism Fix
evidence coverage below 100% state transition accepts empty or non-durable proof enforce evidence in the transition API
invalidation concentrated in discovery nodes search space or completion invariant is too narrow widen read-only checks before approval
path stretch high, ready-but-idle low duration estimates or external waits dominate recalibrate estimates; expose approval and queue time
path stretch high, ready-but-idle high scheduler is not admitting runnable work inspect capacity and resource-key conflicts
planning tax high, repair rate low plan is being re-serialised or reconsidered without change render a compact delta and plan only at triggers
many full revisions share one failed node step is too large or infeasible decompose once, then escalate if the frontier remains empty
drift rate above zero revision path can mutate the goal contract store the goal and invariants outside model-editable state

Planning measurement earns its keep when it changes a control. Reject evidence-free completion. Recalibrate duration estimates. Widen a discovery search. Reduce false resource conflicts. Escalate an infeasible frontier. A dashboard that cannot point to one of those actions is recording the planner’s activity, not measuring its quality.

6.10Todo state in shipped systems#

Documented products expose explicit task state in different forms. Hermes intercepts todo as harness state before general tool dispatch.4 Cline provides /deep-planning and separate Plan and Act modes.6 Its subagent guide also describes Plan-mode shell commands that can write files.7

Devin’s older Playbooks separate Procedure, Specifications, Advice and Forbidden Actions.9 Its guide directs new work to Skills. New accounts start with Skills and no Playbooks from 24 October 2026.

That last detail deserves a moment. A plan template with an explicit Forbidden Actions section encodes something the research on self-critique supports: explicit prohibited actions can complement positive acceptance criteria. Neither is automatically reliable: enforce authorization in the harness and validate that revisions preserve both. If your plan format has no place for them, add one.

33In the wildCheck the actual mode boundary - Cline’s Plan/Act overview describes Plan mode as unable to edit files or execute commands. Its current subagent guide describes a narrower restriction: Plan children lack edit tools but can run some commands that write files. Treat the mode label as a product feature, then test the selected runtime’s actual permissions. Checked 9 November 2026: Plan and Act, subagents.

6.11Delegation, and when to reach for it#

A planning structure warrants delegation only when subtasks can run independently under explicit contracts (Chapter 28).

Delegate when all four hold:

  1. The subtask is genuinely independent. It does not need the parent’s working context to make its decisions.
  2. Its result is compact. A sub-agent that returns forty thousand tokens has moved the context problem, not solved it.
  3. The parent can verify the result cheaply. Without this you have added an unverifiable dependency and lost visibility into it.
  4. The subtask would otherwise pollute the parent’s context. This is the actual benefit: exploratory search that reads two hundred files and needs to report three, where the parent should see the three.

Delegation limits differ by product. Hermes children start with fresh conversations and default to leaf mode. Its documented defaults cap child iterations at 50 and prevent nested delegation unless spawn depth is raised.5 Cline’s CLI and Desktop children inherit mode-specific tools, lack MCP tools and can start children. Act children can edit and run commands.7 Goose subrecipes use separate sessions without shared conversation history, memory or state, and prohibit nesting.8

The products differ in tool access and recursion. Their shared benefit is a separate context. Set explicit tool permissions, depth limits and a shared budget before enabling nested delegation.

Definition

Plan artefact — the plan as structured, revisable state owned by the harness, rather than prose in the model’s context.

Frontier — the set of steps whose dependencies are satisfied and which may therefore be started.

Goal erosion — the drift of an agent’s working objective away from the original request across successive plan revisions.

Key Takeaways

  • A plan’s value is as a structure for gathering information, not a script for executing it. Plan-then-act fails because every step inherits step zero’s ignorance, and the research is consistent that models do not reliably repair their own plans without external feedback.
  • Make the plan a first-class artefact in harness state — with BLOCKED distinct from PENDING, abandoned steps keeping their reason, a verification criterion per step, and dependencies making it a graph rather than a list.
  • The artefact pays for its tokens in four currencies: a progress signal, an interruption point, a resumption anchor, and a grip on drift.
  • Run the read-only steps before committing to the plan, then revise. It is the most reliable improvement to plan quality that does not require a better model — and it makes any subsequent human approval an approval of evidence rather than of a guess.
  • Prefer minimal evidence-backed revisions. Investigate repeated no-progress replans; a fixed revision count alone does not prove a blocker. Guard the original goal verbatim and forbid compaction from touching it, or the agent will drift somewhere the requester would not recognise.
  • Price a task graph in three quantities: active work, adjusted wall-clock time and ideal critical path. Parallelism is useful only when the critical-path reduction exceeds coordination and resource-conflict costs.
  • Measure planning at its control seams — evidence coverage, invalidation, path stretch, ready-but-idle time and goal drift — and attach every revision to the observation that justified it.
  • Delegate only when the subtask is independent, its result is compact, the parent can verify it cheaply, and it would otherwise pollute the parent’s context. Default to no recursion.

Hands-on

Give your agent a plan it can be held to 1. Take a real multi-step task your agent handles today and write down what it actually did, turn by turn. Now write the plan that work implies. Notice how much of the structure existed only in the transcript. 2. Implement the Plan/Step artefact with the five states. Put it in your event log so revisions are recorded facts, then show the current plan in whatever UI your users see. 3. Add a required verification field and refuse to accept a step without one. Run your existing tasks and see how many steps you cannot write a verification for — those are the steps that were never really done. 4. Implement plan-then-verify: execute only the read-only steps, then re-prompt for a revision. Measure how often the revised plan differs from the original. In most codebases the number is uncomfortably high, and that is the value. 5. Count replans without new evidence and choose an alert threshold. Inspect triggered runs to distinguish discovery, live waits, invalid graphs and repeated failure. 6. Annotate one plan with illustrative or measured durations, calculate its critical path by hand, then add the real coordination work. Compare active work, ideal schedule and observed wall-clock time rather than calling all three “cost.” 7. Instrument evidence coverage, invalidation ratio, critical-path stretch and ready-but-idle rate for twenty runs. Pick the worst seam, inspect five trajectories and change the control that owns it.


  1. Valmeekam, K. et al. On the Planning Abilities of Large Language Models: A Critical Investigation. arXiv:2305.15771. https://arxiv.org/abs/2305.15771 ↩

  2. Valmeekam, K. et al. Can Large Language Models Really Improve by Self-critiquing Their Own Plans? arXiv:2310.08118. https://arxiv.org/abs/2310.08118 ↩

  3. Huang, J. et al. Large Language Models Cannot Self-Correct Reasoning Yet. arXiv:2310.01798. https://arxiv.org/abs/2310.01798 ↩

  4. Agent loop — Hermes Agent developer guide. Nous Research. https://hermes-agent.nousresearch.com/docs/developer-guide/agent-loop ↩

  5. Delegation — Hermes Agent user guide. https://hermes-agent.nousresearch.com/docs/user-guide/features/delegation ↩

  6. Plan and Act — Cline. https://docs.cline.bot/core-workflows/plan-and-act ↩

  7. Subagents — Cline. CLI and Desktop behavior, checked 9 November 2026. https://docs.cline.bot/features/subagents ↩↩

  8. Subrecipes — goose. Agentic AI Foundation. https://goose-docs.ai/docs/guides/recipes/subrecipes ↩

  9. Creating playbooks — Devin. Cognition. Includes the 24 October 2026 new-account transition to Skills. https://docs.devin.ai/product-guides/creating-playbooks Checked 9 November 2026. ↩